Which contracted power do you need in Portugal?

Published by FuturePower PT, electricians with 20+ years in the UK, now in Portugal

The lights go out, the fridge stops, and nothing is actually broken: the house just asked the grid for more than you pay for. Contracted power is the single most misunderstood line on a Portuguese electricity bill, especially for people arriving from countries that have no such thing. Here is how it works, how to pick a tier, and when the installation itself needs attention.

In Portugal you pay a standing charge for a capacity tier, the potĂȘncia contratada, and a sealed breaker at the entry trips the whole house the moment it draws more. Single-phase tiers run from 1.15 to 13.8 kVA; above that the supply is three-phase, up to 41.4 kVA. Most houses sit at 6.9 kVA, roughly 30 A, which is an oven, a hob and one more large load.

To pick a tier, add up what genuinely runs at the same time, treat a kVA as a kW, and leave a little room. A smart meter and the ERSE simulator can both tell you what your peak has actually been. Changing is a phone call to your supplier; what needs an electrician is a supply the quadro, the entry cable or the earth were never sized for.

What contracted power is

A British or Irish house has a main fuse of 60 to 100 A and pays only for the energy it uses. A Portuguese house pays in two parts: the energy, per kWh, and a daily standing charge that rises with the tier of power you have contracted. The grid operator, E-Redes, enforces the tier with a breaker at the entry, sealed so you cannot change it, or with the smart meter itself where one is installed. Draw more than the tier for more than a moment and it trips. Nothing is damaged; you reset it and switch something off.

The tier is expressed in kVA. For a home, where almost everything is heating or motors with a good power factor, you can read a kVA as a kW. To turn it into amps on a 230 V single-phase supply, divide by 0.23: 6.9 kVA is 30 A.

The tiers, and what each one runs

TierRoughlyWhat it is typically for
1.15 and 2.3 kVA5 and 10 AA garage, a shed, a holiday flat with gas for everything
3.45 kVA15 AA small flat with gas cooking and hot water, no air conditioning. One of the two most common tiers
4.6 kVA20 AA flat with an electric hob or an air-conditioning unit, as long as they do not run together with a washing machine
5.75 kVA25 AA family home with electric cooking and an electric water cylinder
6.9 kVA30 AThe usual choice for a house: oven, hob and one more big load at the same time. The other most common tier
10.35 kVA45 AAn all-electric house, several air-conditioning units, a heat pump, or a 7.4 kW EV charger alongside normal life
13.8 kVA60 AThe top single-phase tier. Beyond it the supply must be three-phase
10.35 to 41.4 kVA, three-phase15 to 60 A per phaseVillas with a pool, air conditioning throughout, an EV charger and a workshop; also an 11 kW or 22 kW charger. Tiers: 10.35, 13.8, 17.25, 20.7, 27.6, 34.5, 41.4 kVA

Three-phase is not "more electricity" so much as three separate 230 V supplies sharing the house. Its loads have to be spread evenly across the three, which is part of why a conversion is an electrician's job, not a supplier's.

How to work out what you need

Add up what actually runs at the same moment, not everything you own. Typical ratings, to be checked against the plate on your own appliances:

A Sunday roast with the oven, two hob rings and a kettle is already 6 to 7 kW. Add a tumble dryer and a water cylinder reheating and a 6.9 kVA supply is gone. That is the whole story behind "the power keeps cutting out".

Two shortcuts beat the arithmetic. A smart meter records the highest power the house has drawn; E-Redes' online account and some suppliers' apps show it, and the meter's own display can be stepped through to the maximum demand reading. And the regulator ERSE publishes a free contracted-power simulator that asks what you own and suggests a tier.

What a tier costs, and how to change it

The tier sets the standing charge, so a higher tier costs a little every day whether you use it or not, which is why people pick low and live with the trips. A tier too low costs you in resets and in the things that stopped mid-cycle; a tier too high costs a few cents a day. Pick the lowest one that gets you through your worst normal evening without planning your appliances around it.

Changing is done through your electricity supplier, the comercializador, who instructs E-Redes. With a smart meter the change is remote and usually done within a day; without one a technician comes within a few working days. You can change as often as you like. The supplier does not ask whether the house can take it, which brings us to the part that is ours.

When the installation needs work before the tier can go up

The tier is a number on a contract. The entry cable, the quadro, its main switch and the earth are physical things that were sized for a particular supply when the house was wired. Common cases where a bigger tier needs an electrician first:

If you are reading this because you are about to buy a house with a pool, air conditioning and plans for an electric car on a 6.9 kVA single-phase supply, the right order is: inspect the installation, decide the supply, then choose the tier. The buying guide covers what to look at before you sign.

If you are coming from the UK

None of this exists in Britain, where the network sizes the supply and you never meet a limit. It is the first difference most arrivals hit, and it sits alongside the other ones: a different plug, radial circuits instead of a ring, a TT earth that leans on RCDs, and sockets in the bathroom. We wrote the full comparison for exactly that moment.

Questions we are asked most

What is 6.9 kVA in amps?

About 30 A on a single-phase 230 V supply (6,900 divided by 230). For a home you can treat a kVA as a kW: 6.9 kVA runs roughly 6.9 kW of appliances at the same moment before the entry breaker trips.

Can I change the contracted power myself?

You ask your electricity supplier (the comercializador) and they instruct E-Redes. With a smart meter the change is made remotely, usually within a day; otherwise a technician visits within a few working days. There is no limit on how often you change. An increase beyond what the installation was declared for can need an electrician's declaration first.

The power trips at night with almost nothing on. Is that the tier?

Probably not. Look at which device tripped. If it is the sealed breaker at the entry, you exceeded the tier, perhaps a water heater and a dryer on timers together. If it is an RCD (a switch with a T test button), that is a fault to earth, usually a damp outdoor fitting or a failing appliance, and raising the tier will not help. That one needs an electrician.

Do I need three-phase for an EV charger?

Not necessarily. A 7.4 kW single-phase charger draws 32 A, which fits a 10.35 or 13.8 kVA single-phase supply, and a charger with dynamic load management can share a 6.9 kVA supply by slowing down while the oven is on. Three-phase makes sense when you also run several air-conditioning units, a heat pump or a pool, or want an 11 kW charger.

Does solar change my contracted power?

No. The contracted tier is the power you can draw from the grid at any moment, and it still applies on a cloudy evening when the panels give nothing. Self-consumption is registered separately. What solar can do is let you stop paying for a tier you only needed on sunny days.

Want someone who has worked under both?

We are Portuguese electricians, City & Guilds and 18th Edition qualified in the UK, DGEG-registered in Portugal, working across the Algarve and the south. Tell us the town and the job, and we will come and look, test, and give you a written quote. The visit costs nothing.

Request a quote