Buying a house in the Algarve? Check the electrics before you sign
Published by FuturePower PT, electricians with 20+ years in the UK, now in Portugal
Portugal has no electrical certificate on a sale and no periodic inspection for a home, so the house you are falling for may not have had an electrician look at its wiring since it was built. This is what to look at on a viewing, what a proper inspection tests, and which findings change the price.
Ten minutes at the quadro tells you most of it: breakers or old fuses, how many RCDs and whether the test button works, a real earth going outside, what contracted power the house is on and whether it is single or three-phase. If any of those worry you, commission an inspection and test before the promissory contract, not after. The energy certificate the seller must give you is about insulation, not safety.
The faults that cost the most are the ones you cannot see: no earth, no RCD protection, and a board and cables from the 1970s or 1980s behind a fresh coat of paint.
Why nobody has checked
Decree-Law 96/2017 reserves periodic electrical inspection for larger commercial and public installations; an ordinary dwelling is not on the list. New work is signed off by a DGEG-registered technician, but nothing requires anyone to look again. Add the Algarve's particular stock, holiday homes that sit empty half the year, village houses extended room by room, villas from the 1980s building boom, and you get installations that have never been tested since the day they were connected. Houses from before the 1980s very often have no earth at all.
The ten-minute look on a viewing
Ask the agent to show you the quadro, the electrical board, and open it. You are not testing anything; you are looking for the signs below. Ask before pressing anything.
- Breakers or fuses? Rows of modern switches are fine. Ceramic cartridge fuses, a bakelite board or a wooden backboard mean a pre-1980s installation and a new board at least.
- RCDs. Look for switches with a small T test button (the diferenciais). A home should have 30 mA protection on its circuits. One old, less sensitive unit at the top and nothing else is an upgrade waiting to happen. With permission, press the button: it must trip.
- The earth. A green-and-yellow conductor should leave the board towards the outside, to an earth rod or pit near the entry or the meter box. No such conductor, or one that disappears into the plaster, is the single biggest finding. Ask whether its resistance has ever been measured.
- Contracted power and phases. The entry breaker's rating, or a recent bill, tells you the tier (6.9 kVA is 30 A) and whether the supply is single or three-phase. Count what the house runs: air conditioning, pool pump, water heating, your future EV. Our contracted-power guide explains what each tier can carry.
- Labelling and heat. Circuits labelled, cables tidy, nothing scorched, no melted plastic, no smell. A board someone cared about usually sits in an installation someone cared about.
- Sockets. Modern Schuko sockets with earth clips are fine. Old two-pin sockets with no earth contact mean no earth on that circuit, whatever the board says. Too few sockets and a web of extension leads is a rewire conversation.
- Kitchen and bathroom. The hob and oven should be on their own circuits; a bathroom socket is normal in Portugal, but it must be out of the wet zones and behind a 30 mA RCD.
- Outside. Look at the overhead service line and the meter box (portinhola), garden lighting, and especially the pool: the pump on its own RCD, underwater lights on a 12 V supply, no cables running loose over the ground or baked by the sun. Borehole pumps and gate motors are often wired in a hurry.
- Extensions and annexes. A converted garage, a rooftop room, a guest annex: ask who wired it and whether it was declared. "The previous owner's brother" is an answer you will hear.
- The paperwork. For any recent work, ask for the declaration of responsibility and technical sheet (ficha eletrotécnica) from the electrician who did it. An older house may have an inspection certificate from the pre-2017 regime. None of it is compulsory to show you, which is exactly why asking tells you something.
What a proper inspection tests
An inspection and test is a few hours of an electrician's time with instruments, and a written report. It is the Portuguese equivalent of the condition report British buyers are used to, and it covers the things a viewing cannot:
- Continuity of the protective conductor to every socket and fitting: is the earth actually connected, all the way?
- Insulation resistance of each circuit: are the cables still sound, or has sixty years of heat, damp and rodents thinned them?
- Earth electrode resistance: does the rod outside give a low enough path for an RCD to work on a TT supply?
- RCD trip tests with a calibrated tester: do they trip, and fast enough?
- Polarity and coordination: is each cable protected by a breaker it can take, and are the joints made in boxes rather than twisted in the wall?
- A walk of the sockets, lighting, kitchen, bathroom, outside and pool against the RTIEBT, the Portuguese rules.
The report lands in one of three places: fine, fine with a list of small things, or not safe to live with until specific items are fixed. Set its cost against a rewire, and against the price of the house: it is the cheapest due diligence you will do.
The findings that change the price
| Finding | What it means | What fixes it |
|---|---|---|
| No earth | A fault in any appliance stays live on its casing until someone touches it. The most common serious fault in older houses | A new earth electrode and protective conductor, 30 mA RCDs, usually a new board; new cables where the old ones have no earth core |
| No RCD, or one that will not trip | On a TT supply the RCD is the main protection against shock. Without it a fault to earth may never trip anything | 30 mA RCDs on the circuits, which on an old board means replacing it |
| Old board with fuses | 1970s or 1980s installation; no RCD, cables likely undersized for today's loads | A new board, and an honest look at whether the cables behind it are worth keeping |
| Joints in the wall, overfilled conduit, mixed colours | Decades of additions with no plan. Faults will be hard to find and extensions hard to make | Partial or full rewire, which Portuguese conduit makes less destructive than you would fear |
| Pool or garden wiring exposed or on no RCD | Water, sun-damaged cable and bare feet. The highest-risk corner of an Algarve house | Dedicated RCD-protected circuits, cables in conduit, 12 V underwater lighting, bonding |
| 6.9 kVA single-phase with a pool, AC and EV plans | Not a fault, but a supply that will trip daily and may need the entry cable and board resized | A higher tier or three-phase, with the installation sized for it first |
After you buy
- Put the electricity contract in your name; the supplier will ask for the supply's CPE number, which is on any bill.
- Fix the safety items first: earth, RCDs, board. Everything else can wait for the renovation plan.
- Decide the contracted tier once you know what you will run, and before the first winter.
- Keep the inspection report and every declaration of responsibility you are given. The next buyer will ask, and so will your insurer after a fire.
If you grew up with British wiring, most of what you find will look unfamiliar before it looks wrong. Our UK versus Portugal comparison sorts the differences that are just differences from the ones that matter.
Questions we are asked most
Is an electrical certificate required to sell a house in Portugal?
No. The document that is compulsory on a sale is the energy certificate (certificado energético), which rates insulation, windows and heating and says nothing about the wiring. There is also no periodic electrical inspection for an ordinary home. If you want to know the state of the installation, you commission an inspection yourself.
Can a house with no earth be made safe?
Yes, and it is routine. An earth electrode is driven or buried near the entry, a protective conductor is run to the board, the circuits are connected to it as far as the wiring allows, and 30 mA RCDs are fitted. On an old house that usually goes with a new board, and sometimes with new cables where the old ones have no earth core. It is the most common job we do on a newly bought property.
When should I have the inspection done?
Before you sign the promissory contract (the CPCV), while the price is still open. A finding at that stage is a negotiation; the same finding after completion is your bill. A typical house takes a morning.
Does the seller have to fix what the inspection finds?
Not by law. Everything is negotiable: a price adjustment, works done before completion, or walking away if the installation is dangerous and the seller will not move. The report gives you the facts to negotiate with.
The house has a recent energy certificate with a good rating. Does that mean the electrics are fine?
No. The two are unrelated. A house can be rated A for energy and have a 1970s board with no earth. Buyers arriving from the UK confuse the energy certificate with the EICR constantly; it is not that.